Skip to main content
  • Passenger Clearance Building - HZMB

    Roof Cladding and Steelworks
  • HELPING
    COMPANIES GOALS.

    Frames UI Kit is a huge pack of high fidelity assets to create prototypes and wireframes with ease. Consisting from more than 1k elements.
  • Big Collection Experience

    Frames UI Kit is a huge pack of high fidelity assets to create prototypes and wireframes withh fidelity assets to create prototypes.

Substructure and Site Formation Works of Proposed Extension to Columbarium Block B at Aberdeen Chinese Permanent Cemetery – 2468/AB/1/J5/310

Client: Pacific Construction Limited
Main Constractor: Pacific Construction Limited
Work Location: Aberdeen, Hong Kong
Duration: March 2013 – May 2013
Our Position: Manpower Supplier
Our Duties: Supply concreter, coring team, shotcreters, scaffolders, jumbo drill operators