• Hong Kong - Zhuhai - Macao Bridge

    Metal Scaffolding - Hanging Access Scaffold
  • Kowloon West Terminus Station

    Metal Scaffolding - Falseworks and Wokring Platforms
  • Passenger Clearance Building - HZMB

    Roof Cladding and Steelworks

Proposed Residential Development on Lot 1613 at Kap Pin Long

Client: Projexasia Limited
Main Constractor: Projexasia Limited
Work Location: Sai Kung, New Territories
Duration: 15 July 2015 – 2 Sept 2015
Our Position: Lump Sum Subcontractor
Our Duties: Demolition jobs as per the drawings with high accuracy and low margin of errors